Perch Lake Road Project

The Town of St. Joseph is planning to rehabilitate and widen Perch Lake Road from 53rd Street to 60th Street in the spring/summer of 2021.  In general, the project consists of the following:

  1. Pulverize the existing pavement and base
  2. Widen the roadway to a total width of 24’ of pavement
  3. Construct 2’ wide gravel shoulders
  4. Regrade ditches
  5. Replace select culverts

Please contact Kellie Schlegel or Lee Mann (Town Engineer) at the information below if you have any questions or concerns regarding this project, or to provide your contact information.  Please note that additional information will be sent out next spring 2021 with more details regarding the construction process, resident access, mail delivery, etc.

You can also contact the Town Chair, Theresa Johnson, at 715-222-6235, or any of the Town Supervisors with your questions or comments.

Lee Mann – Town Engineer (Stantec)

651-775-5956 

Lee.mann@stantec.com

Kellie Schlegel – Design Engineer (Stantec)

651-775-5622

kellie.schlegel@stantec.com

 

Project Schedule

Design In Progress
Town Board Authorizes Project Bidding December 10, 2020
Advertisement for Bids Published January 14, 2021
Bid Opening February 4, 2021
Town Board Considers Project Award February 11, 2021
Construction Starts Spring/Summer 2021
Construction Complete Summer/Fall 2021

 

Project Contacts

Town Engineer

Lee Mann (Stantec)

Lee.mann@stantec.com

651-775-5956

 

Design Engineer

Kellie Schlegel (Stantec)

Kellie.schlegel@stantec.com

651-775-5622

 

Design Engineer

Joe Pond (Stantec)

Joseph.pond@stantec.com

612-712-2112

 

Construction Manager

Ryan Marquette (Stantec)

Ryan.marquette@stantec.com

612-413-6202

 

Town Chair

Theresa Johnson

chair@townofstjoseph.com

715-222-6235